877.859.TIER

Charlotte 2

TierPoint’s data centers in Charlotte provide Disaster Recovery as a Service (DRaaS), cloud services, managed services and more. They’re audited underThe space is located in a secure facility audited under ITAR, EU-US Privacy, SOC 1, SOC 2, HIPAA, GLBA, and PCI Colo standards annually and are designed to meet the most demanding requirements. TierPoint’s state-of-the-art Charlotte data centers are capable of handling enterprise-class server management applications for customers nationwide.

Highlights
  • One of four TierPoint data centers in Charlotte, and seven in North Carolina
  • 75,000 sq. ft. of raised floor space across four data centers on campus
  • Charlotte presence established in 2003
  • Dark fiber ring between Charlotte facilities
  • II on-net carriers
  • I00% uptime SLA
  • Charlotte hospital power grid (region’s #I priority grid)
  • Financial district fiber interconnect
Facility
  • 7,370 sq. ft. of raised data center floor
  • Building strategically located outside of severe weather and seismic zones
  • Building is rated to withstand hurricane-force winds
  • Full brick ballistic-resistant walls with no exterior windows
  • 24-in. raised floor provides static pressure cooling from below to ensure efficient and effective cooling of computer equipment
  • Masonry, brick and steel construction
  • Hurricane wind-rated roof
  • Leak detection system
Security
  • 24-hour physical security staff monitors all cameras, door positions and badge access areas
  • Lightning protection throughout the perimeter, rooftop and electrical and mechanical support infrastructure
  • No external signs or branded advertising of facility location
  • Redundant off-site monitoring of all security systems
  • Badge and biometric scan required for entrance into data center: Biometric hand scanner verifies individual’s unique hand geometry and heat signature before allowing entry
Power
  • 8I0kW power capacity
  • Fully redundant 2MW diesel generators, regularly tested, for added protection
  • More than two days of generator power on-site
  • Facility located on primary power grid close to local power substation
Network
  • Carrier neutral, high availability and resilient Internet connectivity
  • Multiple diverse feeds to each from separate paths to the building
  • TierPoint provided, redundant IP bandwidth available with I0GB connectivity
  • TierPoint provides cross connections, of standard media types, to connect customers to the carrier of their choice
Connectivity

On-Net Carriers

  • AT&T
  • Century Link
  • Cogent
  • Level 3
  • Lightower
  • Palmetto Net
  • Time Warner Cable
  • TW Telecom
  • Verizon
  • Windstream
  • XO Communications
  • Zayo

Charlotte 2 Location

125 North Myers Street
Charlotte, NC 28202
(877) 859-8437